===============
- Arranged the lots in technical room, copied down the device name, lot number and how many box of lot found for each lot number.
- Searched for the total quantity for each lot in Genesis website.
- Updated SO8 Flat Lead Focus Defect and SO8 Flat Lead yield monitoring for week 20.
- Updated GRR and Bias Study for machine Q36(QA).
- Updated VFP min limit =0.2 for SMC_AT_6BIN package.
25.05.2010(Tuesday)
===============
- Searched for lot SBP017S8K033 in scheduling room and passed it to engineer.
- Recorded the standoff readings for Powermite(lot no: P012PMG2Y) in production line.
Device Name: PowerMite(picture taken from Google)
* Standoff reading for vision spec is in between -1.9 --> 3 mil. Smaller or greater than the range may caused customer return!
- Uploaded VFP min limit = 0.2 for SMB package and generated report for it.
26.05.2010(Wednesday)
=================
- Uploaded VFP min limit = 0.2 for SMC_AT_6BIN program.
- Edited the program(the range of max and min limit) of FT2 and QA for u8Flat Lead device in newton.onsemi.com website by using the Editor.exe software.
~ Got my second month salary today!^^
27.05.2010(Thursday)
================
- Uploaded VFP min limit = 0.2 and generated report for SMB package.
- Rechecked the sealing temperature, sealing pressure(Bar) and peel force(gms) for logs for specific package and machine.
28.05.2010(Friday)
==============
- Public Holiday!!(Wesak Day)..:)

0 comments:
Post a Comment